Labour cost Calculator

Estimate labour cost from crew size and time.

Back to the toolbox

How to use this calculator

01

Your measurements

Enter your project values to update the estimate.

hours
currency units

View your estimate

Use a loaded hourly cost if you want to include employment overheads. This does not calculate payroll entitlements.

YOUR ESTIMATE

Labour cost

960currency units
Total person-hours16 hours

Calculated from your measurements.

Pricing calculator

Use your supplier’s rate or enter a quoted total. Save each estimate to your project and print everything together.

Your selected quantity already includes any allowance shown in that result. Check whether you are pricing individual items or whole packs. Delivery, tax and labour are not added automatically. A quoted total applies only to this saved calculation.

Labour cost Calculator: measuring notes and method

Distinguish crew hours from person-hours

Two people working eight hours each produce sixteen person-hours. Enter Hours per person as eight, not sixteen, or the crew size would be counted twice.

Use a consistent rate basis

Decide whether the hourly figure is a wage, a loaded employment cost or a subcontract charge. Keep that basis consistent across the people in the estimate.

CHECK A PRACTICAL EXAMPLE

Crew size changes person-hours

Compare two crews working eight hours per person at an illustrative cost of 60 currency units per person-hour.

Two people

Labour cost
960 currency units
Total person-hours
16 hours
Try these inputs

Three people

Labour cost
1,440 currency units
Total person-hours
24 hours
Try these inputs

This comparison holds duration fixed. A bigger crew does not automatically complete the same task in proportionally less time. The rate is an arithmetic example, not a wage or market quote.

Fixed comparison in metric units. Values are illustrative unless linked to a recorded project; changing the calculator above does not change this example.

Formula

Labour cost = people × hours per person × hourly cost.

Worked example

Illustrative values match Reset example and stay fixed when you edit the calculator.

Starting-value worked example

Number of people
2
Hours per person
8 hours
Hourly cost per person
60 currency units

Labour cost: 960 currency units

Follow the calculation

  1. Person-hours = 2 × 8 = 16.
  2. Labour cost = 16 × 60 = 960 currency units.

Reviewed 19 October 2026. How calculations are checked · Report a correction