Excavation Volume Calculator

Measure a rectangular excavation in cubic units.

Back to the toolbox

How to use this calculator

01

Your measurements

Choose the unit beside each measurement. Changing a unit converts your value.

m
m
mm
%

View your estimate

Use the measured excavation depth. Add allowances for over-dig manually; this does not design safe excavation slopes.

6 m4 m500 mm
Dimension guide · not to scale

YOUR ESTIMATE

Excavated volume with allowance

13.2m³
Measured volume12 m³
Waste allowance1.2 m³
Footprint24 m²

Same quantity, different units

Excavated volume with allowance

m³
13.2
yd³
17.2649
ft³
466.1536

Calculated from your measurements.

Pricing calculator

Use your supplier’s rate or enter a quoted total. Save each estimate to your project and print everything together.

Your selected quantity already includes any allowance shown in that result. Check whether you are pricing individual items or whole packs. Delivery, tax and labour are not added automatically. A quoted total applies only to this saved calculation.

Excavation Volume Calculator: measuring notes and method

Record depth changes explicitly

Use excavation dimensions, which may differ from the finished slab dimensions. Separate sections with different depths or working-space requirements. This tool treats each entry as a rectangular prism; it does not infer side slopes.

Keep spoil and backfill quantities separate

The result describes in-place geometry. Loose spoil for transport and compacted backfill are different material conditions. Do not use the same volume unchanged for all three without checking the relevant conversion.

Formula

Volume = length × width × depth × quantity. Order volume = volume × (1 + waste ÷ 100).

Worked examples in metric and imperial units

Illustrative values match Reset example and stay fixed when you edit the calculator. Both columns describe the same calculation; converted inputs are rounded.

Metric worked example

Length
6 m
Width
4 m
Depth / thickness
500 mm
Quantity
1
Waste allowance
10 %

Excavated volume with allowance: 13.2 m³

Imperial worked example

Length
19.685 ft
Width
13.1234 ft
Depth / thickness
19.685 in
Quantity
1
Waste allowance
10 %

Excavated volume with allowance: 17.2649 yd³

Follow the calculation

Lengths in this working are in metres.

  1. Measured volume = 6 × 4 × 0.5 × 1 = 12 m³.
  2. Allowance multiplier = 1 + 10 ÷ 100 = 1.1.
  3. Volume with allowance = 12 × 1.1 m³.

Excavation volume versus loose spoil

A 6 m × 4 m × 0.5 m dig contains 12 m³ in place. An illustrative 20% swell produces 14.4 m³ of loose spoil. In the truckload calculator, enter the 12 m³ in-place quantity with 20% swell, rather than applying swell again to 14.4 m³.

Unit conversions

1 m³ = 1,000 L ≈ 1.30795 yd³. One cubic yard is 27 ft³.

Reviewed 19 October 2026. How calculations are checked · Report a correction

Related calculators

PRACTICAL READING

Understand the inputs. Check the order.

Measurement methods and worked examples to use alongside this calculator.

Browse all guides →